Migration tasks
Issue 2.1 June 2006 485
The following list describes general procedures:
Turn off the power to the processor gracefully - pre-conversion administration
Replace the processor control carrier/cabinet with an expansion control carrier or cabinet
Replace the tone clock circuit pack and Maintenance circuit pack with an IP Server
Interface (IPSI) circuit pack and new maintenance circuit pack, respectively
Replace old expansion interface circuit packs with new expansion circuit packs, if
necessary
Connect the IPSI circuit pack to the Ethernet switch on the customer network
Assign an IP address to the IPSI circuit pack
Perform the following tasks to convert a processor port network to a port network (SCC).
Premigration administration:
Connecting to the processor on page 487
Verifying system status on page 487
Recording all busyouts on page 487
Recording node names and IP addresses on page 488
Saving translations on page 488
Migration tasks:
Accessing the media server maintenance web interface on page 489
Verifying the license file on page 489
Copying translation files to media server on page 489
Restoring translation files on page 490
Administering the IPSIs on page 490
Adding IPSI translations to Communication Manager on page 491
Setting the alarm activation level on page 491
Backing up translations on page 492
Verifying hardware on page 492
Removing the processor port network control cabinet on page 493
Installing the expansion control carrier on page 493
Stacking the port media gateways on page 494
Installing IPSI and maintenance circuit packs on page 494
Connecting the CAT5 cables to the IPSI circuit packs on page 497
Installing Expansion Interface circuit packs on page 501