EasyManua.ls Logo

Azbil MagneW Neo PLUS - Page 101

Azbil MagneW Neo PLUS
338 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Azbil Corporation Electrical wiring
Model MTG11A/18A, MTG11B/18B, MTG14C 3-9
Wiring procedure
Carry out the wiring between the instrument and a power supply must be done
according to the following procedure.
*: The numerical value in parentheses is a reference value.
Step Procedure
1 The terminal box cover is fixed by hexagon socket head setscrews (M3).
Loosen the setscrews with an Allen wrench (1.5).
2 Remove the terminal box cover by turning it counterclockwise with the
dedicated tool.
3 Remove the dust plug from the socket for an output signal line conduit.
4 Insert the cable into the conduit cable ground.
~Note Take care not to damage the cable sheath.
5 Referring to Figure 3-6, connect the cable to the output signal terminals
(IOUT+, -) of the terminal box.
~Note Pay attention to the polarity.
Tighten the terminal screws adequately. The
recommended tightening torque is 1.1 ft·lb (1.5 N·m)*.
6
Waterproof the conduit sufficiently to prevent ingression of rainwater, etc.
~Note We recommend using a silicon resin-based non-curing
sealant.
7 Attach the terminal box cover and tighten it adequately with the
dedicated tool. Then, fix the cover with the setscrews.
~Note Take care not injure your fingers on the cover edge or the
carrying thread.
CM2-MTG300-2001.book 9 ペー 01  

Table of Contents

Related product manuals