05 DIAGRAMS
05.1 Electrical Diagram
Refers to ALL. 2.
05.2 Spare
Parts Refers
to ALL. 3
05.3 Ordering Spare Parts
To order spare parts, the following indications must be
stated: Machine type Name of piece Position number
of piece
Quantity required
05.04 Chart of Risks
1. LOADING,
UNLOADING AND
MOVEMENT OF
MACHINE
• DROPPING OF
MACHINE
• DROPPING OF
PAC-KAGING
• HANDLE THE MACHINE, PACKAGED OR
NOT, ONLY MANUALLY
2. INCORRECT
INSTALLATION OF
MACHINE
• ELECTRICAL RUN
DOWN
• ELECTRICAL
BLOWING
• THE POWER TENSION AND THE
FREQUENCY SHOULD BE THOSE
STATED ON THE PLATE
• THE SOCKET MUST BE CONNECTED TO
EARTH
• THE ELECTRIC POWER SUPPLY OF THE
MACHINE MUST HAVE A DIFFERENTIAL
SWITCH SAFETY DEVICE, COORDINATED
WITH THE MAIN EARTH POWER SUPPLY
3. TENSION PRESENT IN
CLOSED CASING
• DO NOT OPEN THE CASING WITHOUT
HAVING UNPLUGGED THE MACHINE
FIRST
4. WORKING WITHOUT
SAFETY DEVICES
•
ELECTROCUTIO
N
• ENTANGLEMENT
• CRUSHING OF
FINGERS
• ABRASION
• DO NOT REMOVE THE SAFETY DEVICES
WHEN THE MACHINE IS IN USE
5. CLEANING OF
MACHINE PARTS IN
CONTACT WITH THE
DOUGH
• ELECTROCUTION
• ELECTRICAL RUN
DOWNS
• ELECTRICAL
BLOW OUTS
• CLEANING OF THE MACHINE MUST
ALWAYS BE CARRIED OUT WHEN THE
MACHINE IS OFF AND DISCONNECTED
(UNPLUGGED FROM MAIN POWER
SUPPLY)