EasyManua.ls Logo

B&Q CSS1199 - Pan Drawer Fittings Continued; Installing Stabilising Bar and Clips; Mounting Front Rail and Dividers

Default Icon
4 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Figure 4.
7
3
7. Identify Front Rail which has spring loaded ends. Secure Front
Rail to front of drawer side extensions by pushing downwards as
shown in fig3.
Spring loaded ends will engage with small recessed slots.
FRONT RAILING
MOUNTING
9
9
Figure 3.
8. Identify centre divider . Ease
locating lugs into Metal Back Panel
and centralise curved moulding over
Front Rail . Push down to engage
(see fig.4)
7
3
9
Figure 5.
9. Place adjustable divider to required position
within drawer unit, and secure to centre divider
(with large curved moulding at top) by firmly
pushing downwards to engage (see fig.5)
8
8
6. Now place the drawer down on the front face, and insert the stabilising clips at the back of each drawer
side, (there is a small snap-on piece (shaded), which should be removed, before fitting) as shown. Now
identify both left and right hand drawer extensions and , and push into place as shown in Figure 2,
ensuring that the stabilising clips are held firmly in place. Now fit a cog end to each end of the metal
stabilising bar , and then fit this to the two stabilising clips and push in, to locate.
Pan Drawer Fittings continued . . .
65
Insert Clip here
Drawer Side
Metal
Drawer
Back
12
12
11
14
12