EasyManua.ls Logo

Baur TG 20/50 User Manual

Baur TG 20/50
43 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
User Manual
Audio Frequency System Locator-Set
TG 20/50, TG 600
UL 30
Ref. No. 822-119 11/2005
BAUR Prüf- und Messtechnik GmbH e-mail: headoffice@baur.at Tel. +43/5522/4941-0
Raiffeisenstrasse 8, A-6832 Sulz/Austria internet: www.baur.at
Fax +43/5522/4941-3
Question and Answer IconNeed help?

Do you have a question about the Baur TG 20/50 and is the answer not in the manual?

Baur TG 20/50 Specifications

General IconGeneral
BrandBaur
ModelTG 20/50
CategoryMeasuring Instruments
LanguageEnglish

Summary

Guide to Operating Instructions

Symbols for Information

Explains symbols used to highlight important information in the manual.

Copyright and Preface

Contains copyright notice and preface detailing manual scope and company rights.

Safety Precautions and Warranty

General Safety Precautions

Outlines safety requirements for operation, installation, and maintenance of the equipment.

Product Warranty Information

Details warranty terms, coverage, limitations, and exclusions for the equipment.

Product Information

Locator-Set Description

Audio Frequency Generators TG 20/50 and TG 600

Describes the TG 20/50 and TG 600 models as audio frequency transmitters.

Universal Locator UL 30

Details the Universal Locator UL 30 receiver and its components.

Magnetic and Acoustic Sensors

Describes available sensors like BM 30 and KH 30 for signal reception.

Technical Specifications

Lists technical data for the TG 20/50, TG 600, and UL 30 devices.

Putting TG 20/50 into Operation

Startup and Battery Management

Covers initial startup, battery testing, charging, and storage recommendations.

Galvanic and Inductive Connection

Explains methods for connecting the TG 20/50 to the cable system.

Load Adaption and Overload Protection

Details procedures for adapting the unit to the load and its overload protection features.

Putting TG 600 into Operation

Mains Operation and Connection

Details requirements for mains operation and how to connect the TG 600 unit.

Operating Modes and Settings

Explains different operating modes, impulse operation, and reduced power settings.

Load Adaption and Overload Protection

Covers procedures for load adaption and the unit's overload protection.

Putting UL 30 into Operation

Startup and Self-Test

Describes the initial power-on sequence, including self-test and battery check.

Working and Configuration Planes

Explains the two display planes and how to navigate them for measurements.

Fault Location Methods

Acoustic Fault Location

Details using acoustic signals and the BM 30 for locating faults.

Distance Manhole Method

Describes a method for locating faults when direct access is limited, like in manholes.

Sheath Fault Location

Explains locating faults specifically on cable sheaths using specialized methods.

Twist Method for Fault Detection

Covers the twist method for fault location, its advantages, and conditions.

Route Tracing Procedures

Frequency Generator Connection

Explains how to connect the frequency generator for active tracing.

Minimum and Maximum Signal Methods

Details using signal peaks and troughs for tracing buried cables.

Depth Determination

Describes how to measure the depth of buried cables.

Terrain and Cable Identification

Covers techniques for examining terrain and identifying specific cables.

Joint Determination (Twist Method)

Explains using the twist method to locate cable joints.

Maintenance and Battery Replacement

UL 30 Battery Replacement

Provides instructions for changing the batteries in the Universal Locator UL 30.

Fuse Replacement Guide

TG 20/50 Fuse Specifications

Lists fuse types and ratings for the TG 20/50 model based on mains voltage.

TG 600 Fuse Specifications

Lists fuse types and ratings for the TG 600 model based on mains voltage.

Packing and Delivery Information

Related product manuals