EasyManua.ls Logo

Baxi Luna 3 Comfort Series User Manual

Baxi Luna 3 Comfort Series
80 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Page #1 background imageLoading...
Page #1 background image
BAXI S.p.A. , l’une des entreprises leader en Europe dans la production d’appareils de chauffage et sanitaires à usage domestique,
(chaudières murales à gaz, chaudières au sol, chauffe-eau électriques, plaques de chauffe en acier), a obtenu la certication CSQ de
conformité aux normes UNI EN ISO 9001. Ce certicat assure que le Système de Qualité en usage aux usines BAXI S.p.A. de Bassano
del Grappa, l’on a produit cette chaudière, satisfait la plus sévère des normes - c’est-à-dire la UNI EN ISO 9001 - qui concerne tous
les stades d’organisation et le personnel intéressé du procès de production et distribution.
BAXI S.p.A., one of the leading European enterprises to produce central heating and hot water devices for domestic use (wall-moun-
ted gaz-operated boilers, oor-standing boilers, electrical water-heaters and steel heating plates) has obtained the QSC certicate of
conformity to the UNI EN ISO 9001 norms. This certicate guarantees that the Quality System applied at the BAXI S.p.A. factory in
Bassano del Grappa, where your boiler was produced, meets the standards of the UNI EN ISO 9001 norm, which is the strictest and
concerns all organization stages and operating personnel involved in the production and distribution processes.
UNI EN ISO 9001
CERTIFICAZIONE DEI SISTEMI
QUALITA' DELLE AZIENDE
High efficiency gas fired wall mounted combination boiler
Chaudière murale à gaz à rendement élevé
Installation and servicing instructions
Notice d’installation et d’entretien
WARNING: If the information in these instructions
is not followed exactly, a re or explosion may result
causing property damage, personal injury or death.
Do not store or use gasoline or other ammable
vapors and liquids in the vicinity of this or any
other appliance.
WHAT TO DO IF YOU SMELL GAS
Do not try to light any appliance.
Do not touch any electrical switch; do not use
any phone in your building.
Immediately call your gas supplier from a
neighbors phone. Follow the gas suppliers
instructions.
If you cannot reach your gas supplier, call the
re department.
Installation and service must be performed by a
qualied installer, service agency or the gas sup-
plier.
AVERTISSEMENT: Assurez-vous de bien suivre les instruc-
tions dennées dans cette notice pour réduire au minimum le
risque d’incendie ou d’explosion ou pour éviter tout dom-
mage matériel, toute blessure ou la mort.
Ne pas entreposer ni utiliser d’essence ou ni d’autres
vapeurs ou liquides inammables à proximité de cet
appareil ou de tout autre appareil.
QUE FAIRE SI VOUS SENTEZ UNE ODEUR DE GAZ
Ne pas tenter d’allumer d’appareil.
Ne touchez à aucun interrupteur; ne pas vous
servir des téléfhones se trouvant dans le bâtiment.
Appelez immédiatement votre fournisseur de gaz
depuis un voisin.
Suivez les instructions du fournisseur.
Si vous ne pouvez rejoindre le fournisseur, appelez
le service des incendies.
L’installation et l’entretien doivent être assurés par un
installateur ou un service d’entretien qualié ou par le
forunisseur de gaz.

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Baxi Luna 3 Comfort Series and is the answer not in the manual?

Baxi Luna 3 Comfort Series Specifications

General IconGeneral
Modulation Ratio1:5
ModulationYes
Max working temperature80 °C
MountingWall-mounted
Fuel TypeNatural Gas / LPG

Summary

Introduction to Baxi Luna 3 Comfort Boilers

Technical Data and Specifications

Performance Metrics

Details heat input, output, burner pressure, and gas rates for central heating and domestic hot water.

System Specifications

Specifies system pressures, temperatures, connections, and water content for central heating and DHW.

Boiler Component List

Lists key boiler components like heat exchangers, pump, and gas valve.

Clearances for Servicing

Details minimum clearances required for servicing the boiler.

General Boiler Dimensions

Provides boiler dimensions, gas connection size, and duct diameters.

Electrical Supply Requirements

Specifies electrical supply voltage, power consumption, fuse, and spark gap.

Pump Head for Central Heating

Graph showing pump head versus water flow rate for central heating.

System Volume and Pressure

Details system volume, expansion vessel capacity, and pressure notes.

Boiler Schematic: Central Heating Mode

Explains the sequence of operations for central heating mode.

Boiler Schematic: 1.310 Fi Central Heating Mode

Explains boiler operation for Central Heating Mode for a specific model.

Boiler Operation: Domestic Hot Water Mode

Explains boiler operation sequence for Domestic Hot Water Mode.

Frost Protection Mode Functionality

Describes the frost protection function that activates the boiler below 5°C.

Pump Protection Operation

Explains automatic pump operation for protection every 24 hours.

General Boiler Information and Requirements

Gas Supply Requirements

Specifies gas rate requirements, pipe size, and testing procedures.

Electrical Supply and Wiring

Details electrical supply, grounding, wiring, and installation codes.

Air Supply Requirements

States that no air vents are required in the installation room.

Flue System Overview

Discusses flue system requirements, warnings, and concentric system details.

Flue System Options and Lengths

Lists permissible equivalent flue lengths and bend specifications.

Two Pipe Flue System Details

Describes the two-pipe system for flue and air, including installation notes.

Vertical Flue Terminal Installation Options

Discusses installation options and insulation for vertical flue terminals.

Split Flue Air Control Adjustment

Explains how to adjust split flue air control for performance optimization.

Flue Terminal Location Guidelines

Provides guidelines and diagrams for flue terminal location according to CGA B149.

Vent Termination Minimum Clearances

Lists minimum clearance distances for vent termination based on location.

Boiler Installation Location Requirements

Specifies requirements and considerations for boiler installation location.

Central Heating System Design

Explains the design for a sealed central heating system and built-in components.

Filling the Central Heating System

Details the procedure for filling and pressurizing the central heating system.

Toxic Chemical Warning

Warning against using toxic chemicals for boiler treatment in potable water.

Heating System and Refrigeration System

Discusses boiler installation with refrigeration systems and protection measures.

Installation Procedures

Boiler Unpacking Instructions

Details the contents of the boiler packaging and unpacking procedure.

Servicing Clearances

Illustrates and specifies minimum clearances needed for boiler servicing.

Closet Installation Clearances

Shows required clearances for installing the boiler in a confined space.

Clearances for Combustibles

Specifies clearances from combustible materials and site preparation.

Wall Preparation for Installation

Guides on positioning the boiler and marking holes for mounting and flue.

Mounting the Boiler

Instructions for lifting and securing the boiler onto the wall.

Pipework Connections

Details pipework connections, flushing, and valve fitting procedures.

Mains Electrical Connection

Guides on connecting the electrical mains supply to the boiler's terminal block.

Commissioning Steps

Filling the Heating System

Step-by-step instructions for filling the heating system with water and venting.

Gas Soundness Test and Supply Purge

Procedures for testing gas supply soundness and purging the system.

Boiler Control Panel Overview

Overview of the boiler control panel and its functions.

Initial Boiler Lighting Procedure

Instructions for the initial lighting of the boiler and setting modes.

Gas Type Conversion Procedure

Details the procedure for adapting the boiler to different gas types.

Nominal Heat Output Adjustment

Procedure for adjusting the boiler to nominal heat output.

Reduced Heat Output Adjustment

Procedure for adjusting the boiler to reduced heat output.

Post-Adjustment Final Checks

Final checks after gas change and adjustments.

Final Commissioning Steps

Steps for final commissioning, including system balancing and flushing.

Final Assembly and Handover

Instructions for final assembly of the control panel and handover.

User Handover Information

Key information to be provided to the end-user regarding operation and servicing.

Boiler Operating Modes

Central Heating Mode Operation

Explains how the boiler operates in central heating mode.

Domestic Hot Water Mode Operation

Explains how the boiler operates in domestic hot water mode.

Frost Thermostat Function

Describes the function of the built-in frost thermostat.

Pump Protection Function

Explains the automatic pump operation for preventing stagnation.

Low Water Cut-Off Protection

Describes the low water cut-off device protecting the heat exchanger.

Remote Control Installation

Front Panel Remote Control Installation

Step-by-step guide for installing the remote control on the boiler's front panel.

Wall-Mounted Remote Control Installation

Instructions for mounting the remote control on a wall.

External Sensor Probe Connection

External Hot Water Tank Connection

Multi-Zone System Electrical Connections

Relay Card Connection for Multi-Zone

How to connect an optional relay card for multi-zone systems.

Zone Connections for Multi-Zone

Details on connecting zones for multi-zone system control.

Solar Function for DHW

Pre-Heat Function for Comfort

Routine Servicing Procedures

Pre-Servicing Notes and Checks

Critical checks and safety notes before performing boiler servicing.

Boiler Component Cleaning

Procedures for cleaning internal components of the boiler.

Component Replacement and Cleaning

Boiler Draining Procedure

Instructions for draining the boiler's heating and hot water circuits.

Heat Exchanger Replacement

Procedure for removing and replacing the heat exchanger.

Burner Replacement

Steps for removing and replacing the burner assembly.

Injector Replacement

Procedure for removing and replacing boiler injectors.

Electrode Replacement

Instructions for removing and replacing ignition and flame sensing electrodes.

Plate Heat Exchanger Removal

Procedure for removing the plate heat exchanger.

Seal Replacement Guidance

Guidance on replacing seals between manifolds and the heat exchanger.

DHW System Maintenance

DHW System Limestone Deposit Purge

Procedure for purging the DHW system to remove limestone deposits.

DHW Heat Exchanger Disassembly

Steps for disassembling the DHW heat exchanger.

Cold Water Filter Cleaning

Instructions for cleaning the cold water filter.

Parameter Display and Settings

Accessing Information and Settings

How to access and navigate the information and advanced setting modes.

Boiler Parameters Setting Guide

Wiring Diagrams

Service History Log

Related product manuals