EasyManua.ls Logo

BBA Pumps BA Series - Disposal Procedures and CE Declaration

BBA Pumps BA Series
118 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
BA series pumps
Disposal 1401
11.1
11 Disposal
If the pump or pump unit is scrapped and disassembled at the end-of-life, the regulations for waste
disposal in force at the time and location of disassembly must be observed.
The pump or pump unit is constructed of common materials.
At the time of construction there were waste disposal methods available for these materials.
After careful cleaning of the pump and pump unit at the time of construction there were no special risks
known for persons responsible for the disassembly work.
Observe the environmental regulations in force at the time of disassembly to prevent environmental
pollution.
Prior to beginning disassembly, complete the following tasks:
Drain the pump and clean the inside of the pump (see chapter 10).
For a diesel engine drive, follow the guidelines provided by
the manufacturer of the diesel engine.
Remove the fuel from the fuel tank.
Drain the coolant.
Keep the liquids separate and submit them to
a collection centre authorised for their disposal.

Table of Contents

Related product manuals