EasyManua.ls Logo

Beaver M50 - Taking Down the Flood Barrier; Drain Water; Fold and Roll Together; Tie Together

Default Icon
2 pages
Print Icon
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Beaver
Flood and Storm
Protection System
BEAVER PROTECTION SYSTEMS LTD.
Rothmatte 2 · CH-6022 Grosswangen
Phone +41 (0)79 549 72 60
www.beaver-ag.com · info@beaver-ag.com
For information about handling, maintenance and sto-
rage please refer to the separate data sheet.
Assembly instructions
for types M50,
MXL80/H100
1. DRAIN WATER
2. FOLD / ROLL TOGETHER
3. TIE TOGETHER
Open the clamping
plates - the water
will drain away.
Check:
Any damage to the
hose dam must be
professionally repai-
red.
Tie up the folded
hose dam with the
straps.
Once the Beaver
hose dam element
has been completely
drained, dried and
cleaned, it is folded
up. For information
about maintenance
refer to the separate
data sheet.
TAKING DOWN