Switching on and duplicating
1. Switch on main power switch on right side of
unit.
2. Display shows actual temperature of the dupli-
cating material.
3. Press T1 (see notes).
After the desired temperature is reached:
4. Place flask under the outlet.
5. Open the tap by turning it to the left,
close the tap by turning it to the right.
Notes
• Remove and collect any excess duplicating
material after it has hardened.
• Press T1: duplicating material is melted and
subsequently cooled down to operating tem-
perature.
Duration with 6 kg of duplication material: 3 - 4
hours, depending on the duplicating material
used and the manufacturer. The temperature
progression is displayed. The mixing motor
only starts when the duplicating material
becomes hot (approx. 50 ºC).
Lamp T1 is constantly lit: melting.
Lamp T2 flashes (or is constantly lit): operating
temperature not yet reached (or has been
reached).
• Press T3 after operating temperature has been
reached: duplicating material is cooled down to
the reduced operating temperature - and is
heated up to operating temperature again
10 minutes later.
Lamp T3 flashes (or is constantly lit): reduced
operating temperature not yet reached (or has
been reached).
• Press the button briefly to display the
number of melting operations.
(Example 01:08,
01 = Actual number = melting operations so far,
08 = Max. number = maximum recommended
melting operations.)
Caution: The lamp next to the button
flashes when the last recommended melting
operation is reached: Duplicate in the usual
way. Before switching off the unit, drain off
the old duplicating material.
Do not forget: After filling the unit with fresh
duplicating material, you must reset the counter
for the melting cycles to 0 (press the "+" und
"-" buttons simultaneously and keep them
depressed until the acoustic signal sounds
twice).