EasyManua.ls Logo

Bespoke Infinity - Step 3: Seating and Comfort

Bespoke Infinity
44 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6
Assemble rail joints together working from
bottom to top of stairs.
Note: Offer top tubes first.
Apply grease to male part of joint.
Pins should be flush with stair side of rail.
Fit and tighten joint clamps
Using the installation drawing details:
Check top and bottom rail heights over
the corresponding steps.
Check rail angles
Check lower and upper rails are vertically
in line.
Adjust leg heights as required.
Ensure rail to wall measurements match
the Installation drawing.
RAIL FIXING

Other manuals for Bespoke Infinity