35
ASSE NELLA MANICA and JOLLY IRONING BOARD
ENGLISH
8. INSTALLATION AND USE BF091/BF291
8.1 INSTALLATION
ATTENTION: read and follow carefully all the safety instrucons previusly reported, pay at-
tenon to the instrucons about the electrical system to which the appliance is connected.
1. Open the ironing board and posion the adjustable leg (1) according to the required height.
Place the board on a at and stable oor.
2. Use the support (2) for a steam generator or clothes.
3. When present, install the opon sleeve board. In case of a heated sleeve board, connect the
plug to the outlet onto the ironin board.
4. Connect the power cable (3) to an outlet.
5. Acvate the main switch (4).
8.2 USE
ATTENTION: ENSURE THAT THE ELECTRICAL SYSTEM IS EQUIPPED WITH A DIFFERENTIAL SWI-
TCH (LIFE-SAVING SYSTEM) AND WITH A PROTECTIVE CONDUCTOR (GROUNDING SYSTEM).
1. Set the thermostat (5) as needed (the ideal temperature 50/70 °C).
2. Wait 10 minutes to reach the selected temperature.
3. Press the pedal (6) to vacuum.
4. To avoid condensaon inside the table, only iron when the ironing board is hot and act on
the vacuum pedal each me steam is used. THE MODEL JOLLY COD. BF291 is equipped with
a second pedal to control a blowing motor. Press on the pedal to blow. Blowing helps to bet-
ter iron velvet and parcularly wool, works as an-shininig and refresh bers. The blowing
system gives back soness and strenght to fabrics.
5. Do not leave temperature sensive objects on the board. Do not place heavy clothings on
the support (8).
At the end of the job, turn o all the switches and unplug the machine from the outlet. It is not necessary to
empty the boiler. Empty the boiler at least once a month.