7
Installation (continued)
Installation with skirting/baseboard
To help correct for the offset of a skirting board or baseboard spacers will be
required. Only use spacers for the Upper Gate mount and the Upper Catch
(parts C & G). Measure the width of your skirting/baseboard and use the closest
number of spacers to fit this width.
To install you will need a Phillips screwdriver, pencil, level and drill.
1. Place Guide 1 template on the surface you want the Gate Assembly to be mounted
to with the bottom of the template flush with the floor, use a level to ensure the
guide is straight. Note: leave 2 cm between guide and the edge of the opening to
ensure gate wont overhang edge. Repeat for Guide 2 template the opposite side of
opening.
2. Use pencil to mark the center of each hole, and then remove both Guides.
3. Drill a 3 mm pilot hole at each pencil mark for timber surfaces and for hardwall drill
a 6 mm hole and insert plugs. Note for all other surfaces use suitable fixings.
4. Align each mount in its correct position, use a Phillips screwdriver to tighten screws
till each mount is secure.
Upper Gate Mount Upper Catch Mount