11.1 Maintenance schedule
Lifting systems in continuous operation or in particularly polluted surroundings are to be more
frequently maintained.
After replacing safety-relevant parts, perform additional checks during maintenance work and
document them in the supplied test log.
Daily:
◼ Check electrical cables for damage.
◼ Charge batteries. (→10.9)
◼ After work, completely lower the lifting system and secure against
unauthorised use.
◼ Clean lifting system and working area.
Monthly:
◼ Check hydraulic oil level, top up if necessary. (→11.3)
◼ Check controls on functioning and electrical cables for damage.
◼ Check the tightness of the hydraulic components.
◼ Lubricate rollers.
◼ Perform a function test without load.
◼ Check emergency stop key.
◼ Check the function of the safety catch.
◼ For HydroLift 8.2 only: clean and lubricate the wheel fork notch.
Yearly:
◼ Perform security check.
Every 2 years:
◼ Change oil (→11.5)
Every 6 years:
◼ Change the hydraulic hoses. (→11.7)