3
PLACE 1QTY 1.2 SINGLE BAR (21-0015) AT PREFERRED HEIGHT ATTACH WITH BOLT ASSEM-
BLIES AS SHOWN.
FOLLOW GUIDE BELOW FOR FLOOR MOUNTING.
TIGHTEN ALL BOLT ASSEMBLIES TO 30NM.
#MADEINBELFAST
30
Nm
30
Nm
DRILL HOLE
VACUUM
90MM
HAMMER IN
BOLT
TIGHTEN
-DRILL 10MM HOLE, 90MM DEEP
USING PLATE AS A GUIDE.
-VACUUM OUT THE DUST.
-HAMMER SLEEVE ANCHOR INTO
THE HOLE.
-TIGHTEN SLEEVE ANCHOR TO
SPECIFIED TORQUE
USING 13MM SPANNER.
SLEEVE ANCHOR BOLT FITTING