EasyManua.ls Logo

Bosch ACS 653-P - Replacement High-Pressure Cut-Out Switch

Bosch ACS 653-P
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ACS 653, ACS 663 Service Manual
SP00D00624 2021-04-08 Robert Bosch GmbH
76
Electrical







   
   

   
  
   



Follow these steps to replace the high-pressure
cut-out switch on the unit. See Figure 3-7.
1. Evacuate the unit with a recovery service unit.
2. Turn o󰀨 the power switch and disconnect
the unit from the power source.
3. Open the service rear door.
4. Remove the rear cover (above the service
door) by pushing it up and extract it by
pulling it out.
5. Disconnect the wires from the faulty
high-pressure cut-out switch.
6. Carefully remove the faulty cut-out switch.
7. Clean the tting by wiping away dirt, grease,
and oil.
 DO NOT apply thread sealant to any
internal threads. Apply thread sealant to only
the external pipe threads of the ttings.
8. Install the new high-pressure cut-out switch.
9. Connect the wires to the new switch.
10. Insert the rear cover so that the 4 holes on
the sides the cover t into the 4 clips on the
machine. Push down to hook the rear cover.
11. Close the service rear door.
12. Connect the unit to the power source.
13. Operate the unit and check for leaks.
12. Unit ask for rmware update, press .
13. Unit ask to RESET the board erasing all the
data and calibrations stored, press  and
please wait. After that service routine starts
with required settings.
14. Select  and conrm.
15. Select AC/ACS model (unit require the input
2 times) and conrm.
16. Set  and conrm.
17. Set  (unit require the input
2 times). Take the one in the unit data plate
and conrm.
18. Perform air ow calibration (refer to Calibrate
Air Flow in the Diagnostics and Testing
section) and conrm (for R1234yf only).
19. Perform tank calibration (refer to ISV Load
Cell Calibration in the Diagnostics and
Testing section) and conrm.
20. Perform oil calibration (refer to Drain Load
Cell Calibration in the Diagnostics and
Testing section) and conrm.
21. Select  and conrm.
22. Edit  and conrm.
23. Now unit is ready to install the last encrypted
software present in the USB dongle. If the
dongle is not connected/programmed and
the unit don’t find the software an error
message will be shown on display asking
to retry.
24. The encryption can take several minutes,
the % progress is shown in the display.
25. When unit reboots and displays stand-by
page, please switch unit o󰀨 and reinstall the
plastic frontal cover (take care to secure the
tank with screws).
26. Attach the outside high- (red) and low-side
(blue) service hoses. Tighten at 7.9 Nm
torque.
27. Switch on again and repeat air ow calibration
with plastic frontal cover mounted.
28. Key in the activation code again, using
original serial number the activation code is
still the same. If activation code has been
lost, contact Bosch tech support.
29. Now the unit is ready to use.
 All data input not required into procedure
above are already available in the dedicated
software.
Attach control wires
to these terminals

Table of Contents

Related product manuals