EasyManua.ls Logo

Bosch Buderus SSB399 - Page 11

Bosch Buderus SSB399
28 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Control Operations Guide Bosch Buderus SSB255 | SSB399 | SSB512 Boilers | 11
Bosch Thermotechnology Corp. | 03.2018
Data subject to change
Central Heating Mode 5
(Analog 0-10 Vdc Power % Modulation)
CH Mode“5” - Boiler demand is generated by a 0-10 VDC analog signal from a
Building Management System (BMS). An initial heat request is generated via a signal
of 1.5 VDC or greater. Boiler modulation between “Minimum Power” (par.#15) and
Maximum Power” (par.#14) will occur between 2 and 10 VDC. When a demand
voltage of 1.5 VDC or greater is applied the Boiler and CH pump contacts are
energized and the Boiler will operate at the corresponding Power %. The Power % will
be based upon the voltage signal and scaled between the Minimum and Maximum
power settings. Once the initial demand has occurred The Boiler and CH pump
contacts will remain energized as long as the voltage from the BMS remains greater
than 1 VDC.
Figure 2
OFF
1.0
1.5
2.0
ON
9
Voltage (VDC)
Max Power
Min Power
Modulation
Power (%)
Central Heating
(CH) Mode
Description
Set these Parameters
Parameter # Description Default Range
CH Mode = “5”
Analog 0-10 VDC
Power Modulation
4 System pump overrun 300 sec. 0 – 900 sec.
5 Boiler pump overrun 300 sec. 0 – 900 sec.
7 CH Hysteresis 5.4°F 0 - 36°F
9 Anti-cycle period 180 sec. 10 – 900 sec.
10 Anti-cycle Temp Diff 12.6°F 0 - 36°F
14 Max Power CH 100 % 50 – 100 %
15 Min Power CH/DHW 1% 1 – 30%
24 Design Supply Max. 194°F 80.6 - 194°F
Table 7

Related product manuals