EasyManua.ls Logo

Bosch Condens 2000F30 Regular boiler - 5 Installation |; Unpacking the Boiler; Boiler Room Requirements; Installing the Levelling Feet

Bosch Condens 2000F30 Regular boiler
62 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
INSTALLATION | 19
6 720 ... ... (YYYY/MM)Product Name
5 INSTALLATION
5.1 Unpacking the boiler
Unpacking:
1. Undo the ties securing the carton
If a sharp implement is used, care must be taken not to pierce the
carton or cause injury.
2. Before removing the carton it is advised that the top flaps are opened
and the ancillary items (A, B, & C) are removed and set to one side.
3. The carton can now be lifted off the boiler.
Remove the plastic bag protecting the boiler surfaces and place
safely away from the working area.
General handling guidelines:
Lift only a manageable weight, or ask for help.
When lifting, bend the knees, and keep the back straight and feet
apart.
Do not lift and twist at the same time. Lift and carry items close to the
body
Wear protective clothing and gloves to protect from any sharp edges
Fig. 14 Unpacking
[A] Literature pack
[B] PRV disposal pipe
[C] Levelling feet x4
5.2 Boiler room requirements
5.2.1 Installing the levelling feet
Screw a levelling nut onto the threaded shaft of each of the feet
Screw the threaded shaft into the base of the boiler at each corner as
indicated in figure 15
Adjust the feet to be approximately the same length
Level the boiler as described in section 5.2.2
Fig. 15 Fitting the feet
NOTICE: Boiler start up
All the previous Pre-Installation sections must be
read and requirements met before starting boiler or
flue installation.
NOTICE: Boiler handling
At all times the correct method for handling heavy
objects should be strictly observed.
Take care not to damage the boiler panels or floor.
The boiler may contain water due to factory testing
Store the boiler in a dry area prior to installation
DANGER: Explosive and flammable materials
Do not store flammable materials (paper, curtains,
clothing, primer, paint, …) in proximity to the boiler
NOTICE: Damage to the appliance from contaminated
combustion air
Do not use any cleaners containing chlorine or
hydrogen halide (i.e. spray cans, primers, cleaners,
paint and glue)
Don’t store or use these substances in the boiler
room
Avoid the build up of dust
1
2
6720809859-94.1Wo
A
B
C
NOTICE: Damage from overheating.
Excessive ambient temperatures may cause damage to
the heating system.
Ensure the ambient temperature is above 0 °C and
below 35 °C
NOTICE: Frost damage to the appliance
Fit the boiler in a frost free room
CAUTION: Toppling hazard
Boiler will topple over if tilted passed 45 °
Tilt the boiler to no more than 40 °
Take care when tilting the boiler to fit levelling feet,
ideally two people are required to safely fit the feet.
NOTICE: Damage to boiler
Do not lie the boiler down to fit the levelling feet
x4
6720809850-95.1Wo
<40
o

Table of Contents

Related product manuals