Product Information
5
Condens 7000 FP – 6721846699 (2022/12)
HInstallation and operation
Correct and proper installation and adjustment of the burner and the
controller are the fundamental requirements for safe and economical
operation of the boiler.
The boiler must only be installed and adjusted by an approved
contractor.
Do not change parts at the boiler as otherwise the approval would be
invalidated.
Never modify any parts through which flue gas is routed.
Electrical work must only be carried out by qualified electricians.
With open flue operation: do not cover or reduce the size of
ventilation apertures in doors, windows and walls. Make sure that
windows that are used as combustion air vents cannot be shut
accidentally. Attach a warning sign near the window. If draft-proof
windows are installed, ensure an adequate supply of combustion air.
If the supply air flaps can be closed via motors, combustion must only
start when the supply air flap is fully open (volt free checkback signal
to the boiler controller via failsafe limit switch). Provide for control of
supply air flaps.
Make sure the boiler installation location is frost-proof.
Never shut off pressure relief valves!
Water may escape from the pressure relief valve for the heating
circuit and piping when the water is heating up.
The heating system must be installed and operated in accordance
with the applicable rules of technology as well as national, regional
and local regulations.
HDanger to life from explosion
An increased and permanent ammonia concentration may lead to stress
corrosion cracking on brass (e.g.gas valves, union nuts). As a result,
there is a risk of explosion from gas escaping.
Do not use wall mounted gas boilers in rooms where there is an
increased or permanent ammoniac concentration (e.g. livestock
stables or storage room for fertilisers).
HRisk of damage from operating errors
Operator errors can result in personal injury and/or material damage.
Ensure that children never operate this appliance unsupervised or
play with it.
Ensure that only personnel who can operate this appliance correctly
have access to it.
HInstruction of the operator
Explain to the user how the boiler works and how to operate it.
The operator is responsible for the safety and environmental
compatibility of the heating system (local regulations and laws).
Inform the operator that he or she must not carry out any
modifications or repairs.
Also point out the need for inspection and preventative maintenance
for safe and environmentally friendly operation.
Maintenance and repairs may only be performed by an authorised
heating contractor.
Only use genuine spare parts!
Any other combinations, accessories and wearing parts may only be
used if these are specifically designed for the application and impair
neither the performance characteristics nor the safety requirements.
Operate the boiler only with mounted and closed casing.
2Product Information
2.1 Intended use
The Condens GC7000FP is designed for use as a floor standing gas
condensing boiler for DHW and central heating.
Observe the details on the type plate and the technical data
(Chapter 17.1, page 67).
2.2 GB Importer
Bosch Thermotechnology Ltd.
Cotswold Way, Warndon
Worcester WR4 9SW / UK
2.3 Permissible fuels
This product may only be operated using gases from the municipal gas
supply.
For gas type conversion and operation with LPG, the information in the
instructions supplied with this product and/or the required accessories
applies.
Information on the certified gas types can be found in chapter “Technical
data” as well as on the type plate on the product.
Within the scope of the conformity assessment, the use of natural gas
with hydrogen admixtures of up to 20% by volume was also tested and
certified.
You can obtain detailed information on the gas mixture supplied and its
effect on the performance and CO
2
content from your responsible gas
supply company and our service department on request.
2.4 Scope of delivery
The Condens 7000 FP is delivered with a control unit, which is assigned
when ordering, in 2 packaging units.
Upon receipt, check that all packaging is in perfect condition.
Check that all package contents are present.
Dispose of packaging in an environmentally responsible manner.
Table 2 Scope of delivery
Packaging unit Component Packaging
1 (boiler) Floor standing boiler
installed (with gas
burner, without casing)
1 shrink-wrap
package, on a pallet
Adjustable feet 1 shrink-wrap package
Label for gas type
conversion
1 shrink-wrap package
Technical documents 1 shrink-wrap package
Casing 2 boxes, on a pallet
2 (separate) Control unit 1 carton