EasyManua.ls Logo

Bosch D7412GV4 - Ribbon Bar Overview

Bosch D7412GV4
170 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
D9412GV4/D7412GV4 v2.03 | Installation and System Reference Guide | 6.0 Power Outputs
.
Bosch Security Systems, Inc. | 7/16 | F01U265457-09 36
Verification and Reset Output
The default program sets Output C (Terminal 8)
as a verification and reset output. Refer to Output
Parameters and Point Assignments in the Control
Panels (D9412GV4/D7412GV4 v2.03) Program
Entry Guide (P/N: F01U265459) for instructions
on programming verification and reset outputs
and points.
Performing a sensor reset at a keypad produces a
five-sec output activation of verification and reset
outputs. The control panel ignores verification
and resettable points during the five sec.

Table of Contents

Other manuals for Bosch D7412GV4

Related product manuals