EasyManua.ls Logo

Bosch Greenstar combi 151 p - Checking Electrodes

Bosch Greenstar combi 151 p
64 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
50 | Inspection and maintenance
Greenstar combi 100 p / 151 p6720872361 (2017/04)
Loosen/remove pipe connections.
Fig. 65 Removing pipe connections
Remove the boiler pressure gauge from the Heatronic boiler control.
Fig. 66 Removing the boiler pressure gauge
Loosen the quick releases (steps 1 and 2) and remove the hydraulic
assembly in its entirety (step 3).
Fig. 67 Removing the hydraulic assembly
Remove the plate type heat exchanger.
Fig. 68 Removing the plate heat exchanger
Install new plate type heat exchanger with new gaskets and reconnect
the hydraulic assembly in reverse order.
Check all connections used during maintenance for leaks.
14.1.4 Checking electrodes
Remove electrode set including gasket and check electrodes for
contamination; clean or replace, if required.
Reinstall electrode set with new gaskets and check for leaks.
Fig. 69 Reinstalling the electrode set
Fig. 70 Check for leaks
6 720 641 933-47.2O
6 720 641 933-48.2O
1.
1.
3.
2.
6 720 641 933-49.2O
6 720 641 933-50.2O
0010 006 917-001
2-1/4 + 3/4 ft.-lbf.
3 + 1 Nm
0010 006 918-001
Gas/Gaz?

Table of Contents

Other manuals for Bosch Greenstar combi 151 p

Related product manuals