EasyManua.ls Logo

Bosch KBR42-3A - Maintenance

Bosch KBR42-3A
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Common applications of KBR boilers
Greenstar FS/Combi FS – 6 720 810 590 (2020/04)
30
5.2 Multiple zones using circulators with DHW
Fig. 13 Piping
[1] Supply to heating zone 2
[2] Pump heating zone 2
[3] Supply to heating zone 1
[4] Pump heating zone 1
[5] Supply to indirect tank
[6] DHW pump
[7] Drain/Bleed point
[8] Boiler supply pipe 1¼ "
[9] Low Loss Header
[10] Heat only boiler
[11] Boiler return pipe 1¼ "
[12] Return from indirect tank
[13] Return from heating zone 1
[14] Return from heating zone 2
[15] Grain/Bleed point x3
[16] Combination fast fill/back flow preventer
[17] Expansion (tank) vessel
5.2.1 To utilize the LLH
Switch off and isolate the boiler
Drain the boiler
Remove front panel
Locate the LLH at the left-hand side of the lower section of the boiler
1. Unscrew the cap [a] from the body of the LLH [c]
This will break the label across the cap and body indicating that
the LLH has been employed
2. Withdraw the cap [a] and plunger assembly [b]
3. Unscrew the plunger assembly [b] from the cap [a],
4. Set the plunger assembly [b] aside
5. Re-fit the cap [a] without the plunger assembly [b]
6. Tighten the cap [a] and ensure it is secure.
Fig. 14 Utilizing the LLH
6720810590-16.1Wo
1 3 5
12 13 14
11
8
17
9
10
2 4 6
15
16
7
c
a
b
2.
4.
1.
5.
6.
6720811590-37.1Wo
3.

Table of Contents

Other manuals for Bosch KBR42-3A

Related product manuals