2.5 Material Setup & Calibration
2.5.1 Solid Material Setup
Tap on the solid material icon to configure materials desired. It allows to set up to 4 different
solid materials, and 9 application rates and a blast rate for each material.
2.5.2 Solid Material Calibration – Manual or Readback Gate
1. Prepare a container to catch material discharged
2. Make sure that sufficient material in the hopper and the system is safe to run.
3. Press ‘START’ to proceed and follow the instruction on the screen
Note: Press “STOP” button to stop the process anytime during calibration.