2.5.3 Solid Material Calibration – Auto Gate
1. Prepare a container to catch material discharged
2. Make sure that sufficient material in the hopper and the system is safe to run.
3. Press ‘START’ to proceed and follow the instruction on the screen
**Auto Gate operation has two calibration points, Wt/Rev at Gate position 1 and 3. Simply follow steps
on screen to go through the calibration process.