EasyManua.ls Logo

Bosch SHE53TL5UC - Loading the Dishwasher; Rack Loading Principles; Loading the Upper Rack

Bosch SHE53TL5UC
88 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
Attach strain relief (not provided) to opposite side of junction box.
Insert the bare copper or green wire (ground) from the eld supply wiring
into the ground connection “ of the terminal block and securely tighten
the terminal block screw as shown.
Insert the white (neutral) wire to the “N” connection of the terminal block
and securely tighten the terminal block screw.
Insert the black (hot) wire to the “L” connection of the terminal block and
securely tighten the terminal block screw.
Tighten strain relief.
strain relief
(not provided)
A
9

Other manuals for Bosch SHE53TL5UC

Related product manuals