10mm0
-
-
min. 5 mm
~.
' -
:;~-=---
..
'
I
'
I
'
I
'
[]
~
0
J~D
6 720 614 039-05.1 0
0
~ORCESTER
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR
30CD,/40CD'
Convent,onal
Bosch Group 6 720 614 556a (2007/07)
WALL MOUNTING
PLATE
FLUE OPENING
CAUTION:
Ensure
there
are
no
pipes,
elec-
tric
cables,
damp
proof
courses
or
other
hazards
before
drilling.
SAFETY:
All relevant
safety precautions must be under-
taken. Protective clothing, footwear, gloves and
safety
goggles must be worn as appropriate.
FIXING
THE
POSITION
OF
THE
WALL
MOUNTING
PLATE:
The diagram opposite shows the relative
positions
of
the flue and the fixing
of
the wall
mounting plate, the mounting plate and
pipework mounting bracket.
~
Place the hanging bracket on the wall
mounting plate.
~
Place the wall mounting plate with hanging
bracket against the
wall
in
the desired posi-
tion.
~
Mark 4 fixing points through
- one
of
the holes A
- one
of
the holes B
-hole
C
-holeD
in
the wall mounting plate/hanging bracket.
~
Drill the 4 holes for wall mounting plate, wall
hanging bracket and pipework mounting
bracket.
~
Secure wall mounting plate with hanging
bracket with 4 screws
(supplied with the
boiler). Do not fully fasten the lower 2
screws.
FLUE
OUTLET
~
Follow the diagram opposite to mark the
centre
of
the flue for rear outlet
(1,
& 2) or
for side
outlet
(2
& 3).
**
Note: increase this height by
52
mm for
every
1000
mm
of
horizontal length that the
flue outlet is away from the boiler.
~
For the
60/100
mm 0 flue make a 125 mm
diameter
hole through the wall using a core
drill or similar.
For flues using
an
optional weather collar,
fitted from inside the building make a
150 mm
0 hole.
~
Clear away any debris.
FIXING
THE
PIPEWORK
MOUNTING
BRACKET:
~
Mount the pipework mounting bracket on
the 2
lower screws and secure the screws.
WALL MOUNTING
PLATE
FLUE
OPENING