EasyManua.ls Logo

Bosch Worcester Greenstar CDi Conventional Series - Page 25

Bosch Worcester Greenstar CDi Conventional Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A - Standard Flue
B - Internal Wall Seal
C
- External Wall Seal
D-
Clamp
E - Extension Duct
D
E
9
A
B
c
This
screw
should
be fitted last for
I/
easier installation
J
....-------------Flat
at
back
This
screw
should
be fitted last for
easier
installation
~ORCESTER
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CD•/40CD• Convent•onal
Bosch
Group
6 720 614 556a (2007/07)
FLUE
INSTALLATION
ASSEMBLING
THE
FLUE
Slide inner collar (B) onto terminal (A)
2
Additional extensions or bends:
Push fit all extensions/bends/terminal
together and secure connections with
clamps (D). The slope
of
the terminal outlet
must face downwards.
FITTING
THE
FLUE
3 Fit the
terminal (A) through the flue opening
in
the wall, exposing the plastic outlet
section to the outside and fit the outer
flue collar ( C ) over the notches to secure.
4
Assemble turret to boiler using the three
screws
(see below).
Note:
Screws
are
in
boiler
or
in
flue
kit.
FITTING
THE
TURRET:
Flue turret should push directly
down
and
not be twisted into
correct
position.
Fit turret onto
appliance and retain with
three screws.
NOTE: The clamping plate flat should be at
the rear
of
the appliance.
ADDITIONAL
NOTES
AND
REMINDERS:
Ensure that all
cut
lengths are square and
free from burrs.
The
flue, when assembled, is fully sealed
and components are pushed home.
The
flue is set at
an
angle
of
or
52
mm
per
additional
1m
length
of
extension used .
FLUE
INSTALLATION

Related product manuals