EasyManua.ls Logo

Bosch Worcester Greenstar CDi Conventional Series - Pre-Commissioning Checks

Bosch Worcester Greenstar CDi Conventional Series
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
A
I
I
I
'
'
'
2
c
'
............
---
.......
______
...
_.
.. ( r
"'
,"'
....
~
;"
·
~
......
-----
...
____
.........
B
I
I
PRE-COMMISSIONING CHECKS
I
I
I
I
I
I
'
'
'
'
'
'
...........
...........
______
......
I
I
PRE-COMMISSIONING
CHECKS
CAUTION:
ISOLATE
THE
MAINS
SUPPLIES
BEFORE
STARTING
ANY
WORK
AND
OBSERVE
ALL
RELEVANT
SAFETY PRECAUTIONS
~
1.
Check that the service and water pipes
are
connected to the correct position.
A-
Flow (22mm),
B - Return (22mm),
C-
Gas inlet (22mm),
~
2.
Check the gas type specified
on
the iden-
tification plate
(F)
matches that of the gas
supply.
Turn
on
the
main
gas supply, check
the gas pipework, connections and rectify
any
leaks.
~
3.
Check that the condensate pipe has been
connected to the adapter.
IMPORTANT:
If
the
boiler is
not
to
be
com-
missioned
immediately
then:
after
sucess-
fully
completing
all
of
the
checks and any
rectification work,
close
the
gas
and
water
valves,
shut
off
the
gas
supply
and electri-
cally isolate
the
boiler.
INSTALLATION & SERVICING INSTRUCTIONS
FOR
WORCESTER BOSCH GREENSTAR 30CDI/40CDI Coc,ectlocal
~ORCESTER
6 720
614
556a
(2007/07)
Bosch Group

Related product manuals