EasyManua.ls Logo

Bosch Worcester GREENSTAR CDi Series - Page 47

Bosch Worcester GREENSTAR CDi Series
60 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
~ORCESTER
INSTALLATION
&
SERVICING
INSTRUCTIONS
FOR
WORCESTER
BOSCH
GREENSTAR
25CDV30CDV37CDc!42CD'
Bosch
Group
6
720
613
700a
(2006/11)
REPLACEMENT
OF
PARTS
14.
Air/gas
manifold
14.1
~
Remove cover panel (A) by removing
the
screws
(B).
~
Check
that the boiler is completely iso·
lated
from the
gas
supply.
14.2
~
Remove the clips (C) and unscrew the
two
bolts (D).
~
Unscrew and remove the
two
hexagon
screws
(E) securing the fan.
~
Slacken fully the rear securing bolt
(F).
14.3
~
Remove air/gas manifold
(I)
14.4
~
Open
air/gas manifold
(1).
~
Carefully
withdraw
diaphragm
(J)
from
fan intake tube and
check
for
soiling and
splits.
15.
Burner
~
Remove the burner (H).
~
Replace
new
burner
in
correct
posi·
lion.
~
Ensure that a new seal (K) is used.
REPLACEMENT
OF
PARTS

Related product manuals