EasyManua.ls Logo

Bosch Worcester Greenstar Ri ErP + Series - Plumbing Manifold; Connections

Bosch Worcester Greenstar Ri ErP + Series
68 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRE-INSTALLATION
6 720 821 670 (2018/06)22
4.6 PLUMBING MANIFOLD
4.6.1 CONNECTIONS
Use the fittings supplied in the Hardware literature pack:
Use the 22mm copper pipes (1 & 2) provided with the appliance, as
shown in the diagram opposite.
If the flow and return pipes are to be run behind the appliance it
maybe an advantage to connect the pipes before hanging on the wall
especially if space is limited.
Fig. 19 Plumbing manifold
Fig. 20 Pipe work dimensions
Heating System 22mm compression fittings
Gas 22mm compression fittings
Do not use the pre-formed copper pipes supplied with
the appliance for the gas supply.
These copper pipes are for water only.
Further guidance on pipe routing can be found printed
on the appliance template (supplied with the appliance).
Ensure that the pipes are adequately supported and
room between the pipes to avoid noise.
1
2
4
3
3
4
6720644744-13.1Wo
Pipes in alternative position
Return Flow
# Function From left case
edge
Diameter of
pipe
1Gas 55mm 22mm
2Condensate 210mm 22mm
3Cylinder & CH Flow 285mm 22mm
4 Cylinder & CH Return 350mm 22mm
Table 17 Key to figures 19 & 20
6720644744-17.1Wo
reset max
1 2 3 4

Table of Contents

Other manuals for Bosch Worcester Greenstar Ri ErP + Series

Related product manuals