EasyManua.ls Logo

Braun Corporation NCL919FIB-2 - System Schematics and Diagrams; Lift Electrical Schematic

Default Icon
36 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 13
4500
Cycles
Repeat all previously listed inspection, lubrica-
tion and maintenance procedures at 750 cycle
intervals.
Consecutive
750 Cycle
Intervals
Inspect power cable
Mounting
Decals and Antiskid
Resecure, repair or replace if needed.
Check to see that the lift is securely anchored to
the vehicle and there are no loose bolts, broken
welds, or stress fractures.
Replace decals if worn, missing or illegible. Re-
place antiskid if worn or missing.
Maintenance and Lubrication Schedule
continued

Related product manuals