EasyManua.ls Logo

Brother HE-800C - Installing the Operation Panel

Brother HE-800C
107 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
HE-800C
3. INSTALLATION
8
3-7. Installing the operation panel
(1) Operation panel
(2) Screws [4 pcs.]
(3) Cushions [4 pcs.]
1. Pass the cord of the operation panel
(1) through the table hole.
2. Loosen the two screws (4) at the
side of the control box, open the
cord presser plate (5) in the
direction of the arrow, and pass the
cord through the hole into the box.
NOTE:
Check that the operation panel cord
is not being clamped when screwing
the operation panel into the table.
The cord may become damaged if it
is clamped.
4742M
4741M

Table of Contents

Related product manuals