EasyManua.ls Logo

Brother KE-430F Series - Machine Installation; Machine Head Installation

Brother KE-430F Series
90 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. INSTALLATION
13
KE-430F, BE-438F
3-4. Installing the machine head
(1) Pins [2 pcs]
(2) Set screws [2 pcs]
(3) Rubber cushion assembly [2 pcs]
Place the machine head gently on top of
the table.
NOTE:
• Be careful not to clamp any cords
between the machine head and the
table.
When holding the machine head, do
not hold it by the pulse motor or the
solenoid, otherwise it may damage the
pulse motor or solenoid.
(4) Hinge holders [2 pcs]
(5) Bolts [4 pcs]
(6) Plain washers [4 pcs]
(7) Spring washers [4 pcs]
(8) Nuts [4 pcs]
(9) Rubber cushions [3 pcs]
(10) Collar [3 pcs]
(11) Plain washers [3 pcs]
(12) Screws [3 pcs]
(13) Felt
(14) Oil tube
Pass the felt (13) and the oil tube (14)
through the hole in the dust oiler setting
plate (15) into the oiler (16).
2282B
Figure
Pulse motor
Approx. 20mm
Approx. 20mm
Solenoid
2284B

Table of Contents

Related product manuals