EasyManua.ls Logo

brown & sharpe Global 9128 - Daily Maintenance Checklist

Default Icon
144 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
System Maintenance
Global User Manual
9-5
System Maintenance
Note: The scheduled intervals are based on an 8-hour day and a
40-hour week.
If the machine is operated greater than the scheduled interval
(e.g. two 8-hour shifts a day vs. one), adjust the particular
interval as necessary, and continue to perform the preventative
maintenance at that scheduled interval (before the first 8-hour
shift and before the second 8-hour shift).
If the machine is operated less than the designated interval (4
hours a day), continue to perform the preventative maintenance
on a daily (once a day), a monthly (once a month) and a quar-
terly (once every three months) basis.
Scheduled Maintenance Checklist
Daily:
ü Inspect the CMM for any loose or damaged covers. If
necessary, secure any loose covers and repair any damaged
covers.
ü Wipe all the exposed surfaces of air bearing travel ways with
alcohol and a clean, soft cloth towel (medical gauze, or
equivalent).
ü Verify system air pressure indicates 4.0 BAR. Adjust system
air pressure, if necessary. Refer to the Adjustments &
Alignments Section.
Caution:
Do not operate the CMM until the checklist is
completed and all the discrepancies fixed.

Table of Contents

Related product manuals