Ope
rator’s Manual ROTAX 125 MAX evo, Junior MAX evo, Mini MAX evo, Micro MAX evo
Pag
e 56/58
Edi
tion 09/2016
tea
r-down inspection of engine
Ins
pection of the following
com
ponents after every 50
hours of operation: piston,
piston pin and piston bearing
cage, conrod and conrod
bearing, main bearings of
crankshaft, drive of balance
shaft, sealing of water pump
shaft.
Tear-down inspection must be
conducted by an authorized
distributor.
Renew worn parts as required.