Do you have a question about the BRP Sea-Doo GTX WAKE 215 2008 and is the answer not in the manual?
Important preliminary information and warnings regarding the predelivery process.
Remove crate cover and lift watercraft from shipping crate.
Remove engine foam protector and shipping bracket.
Procedures for preparing, installing, and charging a new battery.
Install handlebar covers, mirrors, and related components.
Mount steering assembly, route cables, and install components.
Remove plastic wrapping and access cover for storage.
Position handlebar and measure distance to floorboard for alignment.
Fuel tank filling, pressurization, and safety warnings.
Program keys and configure cluster language/scale settings.
Check engine oil level and adjust throttle cable.
Perform general inspection, remove decal films, and clean watercraft.
Install accessories, provide demo ride, and complete delivery paperwork.
Explain the 10-hour break-in period and associated precautions.