EasyManua.ls Logo

Bruker Anton Paar - CHC plus; CHC plus with TCU 110 and HE-4 Water Bath

Bruker Anton Paar
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix / Service Details
DOC-M88-EXX268_V1_12.2016 107
Figure10.10: Selecting SerialLine/Full X2_RS232_I/-II for SerialConnector
Don’t forget to set the RS232 com port where you have connected the temperature
controller to.
10.2.2 CHC plus
10.2.2.1 CHC plus with TCU 110 and HE-4 Water Bath
Do not change the connectors A25D25 and A25D26
The following procedure is suitable for the Anton Paar chambers.
1. Switch on the Anton Paar controller, the MHG controller, and the Julabo water bath
and wait until the booting process is finished. Follow the instructions on the controller.
2. Launch the DIFFRAC.MEASUREMENT CENTER [4] program.
3. Switch to the CONFIGURATION plugin.
4. Open Device| Goniometer| Center and insert a template by pressing the right
mouse button and selecting Import Template (figure below).
5. Choose Stage_PAAR_CHCplus_LN2Cooling.bfscn in C:\ProgramData\Bruker AXS
\Instrument Configurations\A25\D8_Advance\Stages:
If your chamber is equipped with a motorized Z-stage, you must load the template
Stage_PAAR_CHCplus_LN2Cooling_Motorized.bfscn
6. Press the Open button

Table of Contents

Related product manuals