EasyManua.ls Logo

Bruker Anton Paar - CHC plus with CCU100 and Corio Water Bath

Bruker Anton Paar
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix / Service Details
DOC-M88-EXX268_V1_12.2016 117
10.2.2.2 CHC plus with CCU100 and Corio Water Bath
Do not change the connectors A25D25 and A25D26
The following procedure is suitable for the Anton Paar chamber CHC plus with CCU100
controller and Corio water bath.
1. Switch on the Anton Paar controller, the MHG controller and the Julabo water bath.
Wait until the booting process is finished. Follow the instructions on the controller.
2. The Julabo Corio water bath must be set to Remote ON. Follow the short instruction
in its manual. Press up and down at the same time for ca. 5 seconds and set the
communication to RON.
3. Switch on the diffractometer or reboot the diffractometer.
4. Launch the DIFFRAC.MEASUREMENT CENTER [4] program.
5. Switch to the CONFIGURATION plugin.
6. Open Device| Goniometer| Center and insert a template by pressing the right
mouse button and selecting Import Template (Figure 10.23). If your chamber is
equipped with a motorized Z-stage, you must load the template
Stage_PAAR_CHCplus_LN2Cooling_V2.bfscn
Every time the Corio water bath was switched off, leave it switched off for at least 20
seconds and then switch on again!
CHC plus Version 2 with CCU100 and Corio water bath requires ICS V7

Table of Contents

Related product manuals