EasyManua.ls Logo

Bruker Anton Paar - Configuring the Chamber in DIFFRAC.MEASUREMENT CENTER; Operation

Bruker Anton Paar
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Operation of the CHC plus Humidity Chamber
DOC-M88-EXX268_V1_12.2016 69
Figure7.14: Water flow controller
1 to Julabo 3 to TCU 110 / CCU 100
2 from CHC plus
The water flow controller must be inserted in the backflow of the CHC plus chamber.
7.4 Configuring the Chamber in DIFFRAC.MEASUREMENT
CENTER
Normally, Anton Paar stages come preinstalled with a new system or will be installed by a
Bruker technician upon purchase. They should therefore be ready to use. If this is not the
case, or for some reason the chamber needs to be reinstalled in DIFFRAC.MEASURE-
MENT CENTER, we refer to chapter CHC plus [}107] of the Appendix.
7.5 Operation
NOTICE
Operation above 300°C requires vacuum. Operation below ambient temperatures
requires inert gas (down to ‑120°C) or vacuum (down to ‑180°C). See Anton Paar
Manuals for details.

Table of Contents

Related product manuals