Installation and Operation of the DCS 350 and DHS 1100 Chambers
DOC-M88-EXX268_V1_12.2016 79
Figure8.6: DA VINCI with DHS 1100 selected
5. The fields for temperature control should now appear in the bottom left of the
COMMANDER plug-in (next figure).
Figure8.7: Temperature control field in COMMANDER
8.5.2 Operating the Chamber
To start using the chamber, follow these steps:
1. Open the water supply or compressed air for cooling.
2. Switch on the controller and wait until the booting process is finished. Check for
messages and follow the instructions. If problems are encountered, check the Anton
Paar Manual for your controller.
´ If the chamber is configured, the ICS connects automatically to the controllers after
some minutes. Everything is now ready for operation.
3. Activate the COMMANDER plugin in DIFFRAC.MEASUREMENT CENTER.