Installation and Operation of the BTS 150 and BTS 500 Chambers
98 DOC-M88-EXX268_V1_12.2016
9.4 Configuring the Chamber in DIFFRAC.MEASUREMENT
CENTER
Normally, Anton Paar stages come preinstalled with a new system or will be installed by a
Bruker technician upon purchase. They should therefore be ready to use. If this is not the
case, or for some reason the chamber needs to be reinstalled in DIFFRAC.MEASURE-
MENT CENTER, we refer to paragraph Configuring a Chamber in DIFFRAC.MEASURE-
MENT CENTER [}100] of the Appendix / Service Details [}99].
9.5 Operation and Alignment
Operation and alignment of the BTS series are done just as described in chapter Opera-
tion [}56] and chapter Adjustment of a Chamber on the D8 [}35], respectively.