EasyManua.ls Logo

Bruker Anton Paar - Configuring the Chamber in DIFFRAC.MEASUREMENT CENTER; Operation and Alignment

Bruker Anton Paar
136 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Operation of the BTS 150 and BTS 500 Chambers
98 DOC-M88-EXX268_V1_12.2016
9.4 Configuring the Chamber in DIFFRAC.MEASUREMENT
CENTER
Normally, Anton Paar stages come preinstalled with a new system or will be installed by a
Bruker technician upon purchase. They should therefore be ready to use. If this is not the
case, or for some reason the chamber needs to be reinstalled in DIFFRAC.MEASURE-
MENT CENTER, we refer to paragraph Configuring a Chamber in DIFFRAC.MEASURE-
MENT CENTER [}100] of the Appendix / Service Details [}99].
9.5 Operation and Alignment
Operation and alignment of the BTS series are done just as described in chapter Opera-
tion [}56] and chapter Adjustment of a Chamber on the D8 [}35], respectively.

Table of Contents

Related product manuals