Ceiling Height Requirements
38 / 120 H157654_9_011
5.1 Helium Transfer Line
Figure5.1: Ceiling Height Requirements
1. Ceiling height must allow for insertion of helium transfer lines.
2. Liquid helium dewar.
3. Ceiling height requirements must be met over this area.
4. Magnet.