11.25Screed drying
If the heating system is equipped with underfloor heating, you can enter a screed
drying program with this control unit.
"Underfloor" must be set as the heating
system.
After a power failure, screed drying continues from where it was interrupted.
Call up the service level. "Gen. parameters" is shown as the first main menu.
Turn the rotary selector until the main menu "Heating circ. + no." appears
(here:
"Heating circ. 2").
Press "Display" to call up a submenu (here: "Heating system").
The display shows the selected submenu.
Turn the rotary selector until submenu "Screed drying" appears.
The display shows the selected submenu.
USER INFORMATION
Check with your screed contractor for special requirements for screed drying
prior to enabling this function.
Fig. 17 Screed drying
x Time (days)
y Temperature
a 3 days hold time
b Temp increase by
c Max. temperature
d Setback by