EasyManua.ls Logo

Bunn Crescendo - Bi-Weekly Brew Chamber Maintenance

Bunn Crescendo
34 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
The following instructions will guide you through the steps for installing the switch graphics.
Power off the machine and
unplug.
Open the front door.
Remove the 9 screws that
secure the panel to the back of
the door.
STEP 1
Remove the panel from the
door.
STEP 2
Remove the screws that secure
the holding bracket to door.
STEP 3
Carefully remove the control
board from the door assembly.
STEP 5
Remove the switch graphics
from the door.
Replace with new switch
graphics.
Place the control board back in
the door assembly.
Reassemble the holding bracket
and panel to the door.
STEP 6
Tools Required:
Phillips Screwdriver
Remove the holding bracket.
STEP 4
OPERATING CONTROLS AND INTERFACE
Changing The Switch Graphics - to be performed by qualified service personnel only!

Other manuals for Bunn Crescendo

Related product manuals