EasyManua.ls Logo

Bunn Titan Dual - ELECTRICAL REQUIREMENTS AND HOOK-UP

Bunn Titan Dual
57 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Page 5
ELECTRICAL REQUIREMENTS
WARNING - If the power cord is ever damaged, it must be replaced by the manufacturer or its service agent with
a special cord available from the manufacturer or its service agent in order to avoid a hazard.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components. Damage caused by incorrect
electrical connections is not covered by warranty.
1. An electrician must provide electrical service as specified in conformance with all local, state and federal
electrical codes.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
NOTE - The brewer is shipped without a plug on the power cord. Qualified service personnel must select
and install the proper UL listed grounding type attachment plug specified on the rear of the brewer.
3. Install the specified plug on the attached power cord.
4. Remove the front access panel to gain access to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.
GREEN GREEN
GREEN GREEN
L1, L2, L3, are the 3 phases
V1 = Phase to phase voltage, between any 2
phases.
V2 = Phase to neutral voltage, L1 to neutral
must be 120V.
SYSTEM
VOLTAGE V1 V2
208 208 120
240 240 120
120/208 and 120/240 volt ac
three phase, 50/60 Hz models
Note: This electrical service
consists of 4 current carrying
conductors (Neutral, L1, L2
and L3) and a separate con-
ductor for earth ground.
BLU
RED
BLK
L1
L2
L3
N
40119 102407
L1 L2 L3 N
FOR 3-PHASE OPERATION
CONNECT INPUT WIRING TO
L1,L2,L3 & N AS SHOWN.
BLK
BLU
RED
WHI
TERMINAL
BLOCK
TO MACHINE
FROM POWER SOURCE
TO MACHINE
FROM POWER SOURCE
L1 L2 L3 N
BLK
RED
BLU
WHI
FOR SINGLE PHASE OPERATION
MOVE BLU WIRE INTO
TERMINAL BLOCK WITH BLACK
WIRE, CONNECT INPUT WIRING
TO L1, L2 & N AS SHOWN.
Artwork for P/N: 37947.0002
Artwork Rev: B
Drawn: McK
Date: 10/24/07
GREEN
GREEN

Other manuals for Bunn Titan Dual

Related product manuals