EasyManua.ls Logo

CAME GUARDIAN Series - 6 Installing a double opening; 6.1 Preliminary checks; 6.2 Tools and materials; 6.3 Standard installation

CAME GUARDIAN Series
30 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
2
1
2
4
4
Pag.
12
12 - Manual code:
119G3055
119 G30 55 ver.
1.0
1.0 10/2009 © CAME cancelli automatici s.p.a. - The data and information reported in this installation manual are susceptible to change at any time and without obligation on CAME cancelli automatici s.p.a. to notify users.
ENGLISH
6 Installing a double opening
Only skilled, qualified staff must perform the installation, in full compliance of the current legislation.
6.1 Preliminary checks
Make sure you have all the tools and materials needed to carry out the installation in total safety and in compliance with current
legislation. The figures shows examples of installers’ tools.
6.2 Tools and materials
Before installing the automated device, please:
Set up a proper omnipolar cut-off device, with contacts more than 3 mm apart, and power source isolation;
Set up proper tubing and conduits for the electrical cables to go through with enough protection from any mechanical
damage;
Check that any connections within the container (made to give continuity to the protection circuit) have additional isolation
compared to the other internal power conductors.
Check that the transit entrance area in a proper state and free of any slumps, otherwise apply the required (L=2600 mm x
L=1600 mm x H=120 mm) RCK300 cement base, which ensures proper securing of the turnstile.
1) Automated operator
2) Fence
3) Junction pit
4) Direction indicator
6.3 Standard installation
Intelligent Security & Fire Ltd.