18
STAGE 3
COMMISSIONING THE CONTROL PANEL
3.1 - Initial Wiring & Control Panel Setup
1. Connect power terminals L1 - L2
and a suitable earth (L2 being LIVE!)
2. Select the motor power setting on the
transformer to level 1 for
commissioning.
3. Ensure that the motors are adequetely
earthed.