ENCODER
M2 Acc. Opening &: sets the point at which the gate begins adjusting deceleration before making contact with the opening endpoint of
the second motor (M2).
The beginning point of adjustment is calculated as a percentage ( between 1% and 15%) of the total gate run time.
See illustration on page 32.
M1 Acc. Opening %: sets the point at which the gate begins adjusting deceleration before making contact with the opening endpoint of
the fi rst motor (M1).
The beginning point of adjustment is calculated as a percentage ( between 1% and 15%) of the total gate run time.
See illustration on page 32.