EasyManua.ls Logo

Capenergy C 200 - 5.3 Maintenance Routines Intervals

Default Icon
95 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual
Page 41 of 95
5.3 MAINTENANCE ROUTINES INTERVALS
In the following table you will find an overview of the necessary periodical maintenance
routines for C 400 devices (and the entire product range).
Frequency Task Executed by
Each 5 years. General revision of the equipment.
Verification and checking of the
parameters of power, frequency and
temperature.
MANUFACTURER
After each
treatment
Clean the treatment accessories.
Inspection of the active plate’s gel sleeve.
Inspection of the insulation of the active
plate and the integrity of the passive plate.
Inspection of the insulation of the
capacitive electrodes.
Before each
treatment
Inspection of the accessories’ cables and
connections.
Check the correct functionality of the
safety control
Monthly
Inspection of the central unit.
USER

Related product manuals