EasyManua.ls Logo

Caplain Machines BT10C - BEFORE INSTALLING AND STARTING OPERATIONS

Default Icon
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CORRECTION - Aout. 2009
9
ENGLISH
BEFORE INSTALLING AND STARTING
OPERATIONS
READ THIS MANUAL CAREFULLY RIGHT UP TO
THE LAST LINE
1. THE MACHINE IS DELIVERED IN ITS ORIGINAL PACKING MEETING
SPECIFICATIONS. IT SCREWS ON A PALLET.
2. FOR TRANSPORT YOU NEED TO USE THIS WAY OF PACKAGING.
3. THE UNIT COMPRISES THE FOLLOWING:
1 UNIT PLANETARY MIXER
1 BOWL + 3 TOOLS (WHISK – HOOK AND BEATER)
1 ADDITIONAL EQUIPMENT (IF ORDERED)
1 USER MANUAL
4. THE MACHINE AND ACCCESSORIES MUST BE CHECKED WITH YOUR DEALER ON
UNPACKING SO THAT ANU RESERVATIONS MAY BE PROVED AS TO QUANLITY AND
QUANTITY WITH RESPECT TO DELIVERY ORDER AND TO YOUR ORDER. WE MUST
IMMEDIATELY BE NOTIFIED ON ANYTHING MISSING.
5. THE INSTALLATION, START-UP OPERATION AND ELECTRICAL CONNECTIONS
MUST BE HANDLED BY QUALIFIED STAFF.
6. THE MACHINE MUST BE PLACED ON A CONCRETE BASE.
7. BEFORE MANING ANY ELECTRICAL CONNECTION, MAKE SURE THE VOLTAGE OF
THE MACHINE CORRESPONDS TO THE AVAILABLE CURRENT.
8. THE CONNECTION MUST BE MADE TO THE ELECTRIC TERMINALS THAT MUST
HAVE AN EARTH PLUG IN KEEPING WITH FRENCH STANDARDS. WE ADVISE YOU TO
CONTACT PROFESSIONAL ELECTRICIAN.
9. CHECK THE ROTATION DIRECTION, THE TOOL HAS TO TURN IN THE DIRECTION
OF THE ARROW, (look on the chapter “TECHNICAL DATA” . IF IT’S NOT THE CASE,
PLEASE INVERS ONE OF THE THREE PHASE ON THE PLUG.

Related product manuals