Heosone +050002740 rel. 1.1 - 17.05.2021Checks before commissioning
ENG
4. CHECKS BEFORE COMMISSIONING
Before commissioning the unit, check that:
• the controller’s output current is greater than or equal to the rated or maximum current specified for the compressor;
• the working voltage range is correct;
• the power cables are sized correctly;
• the cross-section and maximum length of the compressor cables are correct, and that these are connected in accordance
with the wiring diagrams;
• all of the controller’s inputs are connected correctly.
• the instructions on installing the individual system components have been followed;
• the total maximum power of direct current (DC) fans complies with the value shown in the technical specifications table in
all operating conditions. Higher power consumption will cause permanent damage to the controller;
• if the user terminal is installed inside the cooler cabinet, parameters HIn (terminal inside cabinet) and rIn (Room temperature
when user terminal inside cabinet) are set correctly. See manual +0300099-.
4.1 User terminal
3
1
2
50002740_002_R01
Buttons
1 display
2 keypad
3 status and operating mode icons
4.1.1 Display
Icon Description On Flashing
Compressor Active -
Evaporator fan Active -
Lights On -
Auxiliary output Active -
Clock Scheduler active -
Defrost Active Awaiting
Service Maintenance request -
HACCP Active -
Tab. 4.a